Pro Hidraulica -

A precast concrete plant faced repeated pump failures every 6 weeks, costing $18k per outage. Solution: Pro Hidraulica performed oil analysis (found high silicon content), installed kidney-loop filtration, and upgraded to a variable-displacement pump. Result: Zero pump failures in 18 months. Energy consumption dropped 22%. Annual savings: $87,000.

pro hidraulica